Step
6
7
ÄKTA readyflux Operating Instructions 29175550 AG
Action
Insert the tubing into the three pinch valves XV-001, XV-002, and XV-003
on the transfer side.
Place the pressure plate on pump P-201.
5 Operation
5.2 Flow kit installation
5.2.4 Install the NFF flow kit
160
Need help?
Do you have a question about the AKTA readyflux and is the answer not in the manual?