cytiva AKTA readyflux Operating Instructions Manual page 158

Hide thumbs Also See for AKTA readyflux:
Table of Contents

Advertisement

Step
1
2
3
ÄKTA readyflux Operating Instructions 29175550 AG
Action
Open the plastic bag.
Hold the tubing before the feed pump and the braided tubing in one hand
and the tubing after the pump chamber in the other hand.
Insert the tubing into pinch valve XV-006 on the system front.
5 Operation
5.2 Flow kit installation
5.2.4 Install the NFF flow kit
158

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AKTA readyflux and is the answer not in the manual?

Table of Contents

Save PDF