Pumps And Valves - cytiva AKTA readyflux Operating Instructions Manual

Hide thumbs Also See for AKTA readyflux:
Table of Contents

Advertisement

3.3.2

Pumps and valves

Introduction
This section describes the components located on the panels of the ÄKTA readyflux
system:
• Front panel
• Transfer side panel
• Permeate side panel
The designations of the components are shown in the flow chart in
chart and description for CFF, on page
Pumps
ÄKTA readyflux has three pumps. Placement is shown in
on page
Pump
P-201
P-202
P-203
ÄKTA readyflux Operating Instructions 29175550 AG
24.
Feed pump
Transfer pump
Permeate pump
48.
Section 3.2 Illustrations,
Pump type
Diaphragm pump
Peristaltic pump
Peristaltic pump
3 System description
3.3 Components
3.3.2 Pumps and valves
Section 3.4.1 Flow-
38

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AKTA readyflux and is the answer not in the manual?

Table of Contents

Save PDF