cytiva AKTA readyflux Operating Instructions Manual page 194

Hide thumbs Also See for AKTA readyflux:
Table of Contents

Advertisement

Report section
Header
Questions
Method notes
Start notes
Run notes
Evaluation notes
Results from instal-
lation test
Comments
Signature
1
UNICORN 7.6 or later version.
Troubleshooting
If one of the components failed the installation test, troubleshooting must be
performed to establish the cause of failure and correct the problem. A failing compo-
nent is identified in the test report by a FAIL result. Troubleshooting is performed by
using the System Control module or manual instructions. See
shooting, on page
ÄKTA readyflux Operating Instructions 29175550 AG
Information
• UNICORN 7 version number
• Name of user who ran the test
• Time and date
• Path of the test report file
Product identification details:
• Bar code of flow kit parts
• pH sensor details
• Protocol for text solution preparation
• Mode for entering codes
• Name of the system
• List of steps that were performed during flow kit instal-
lation
Notes entered in the Start Notes panel before the start of
the component test
Notes entered in the Run Notes dialog box during the
component test
Notes entered after the component test is finished. To view
the evaluation notes in UNICORN
module and click View →Run Record and click the Notes
tab.
Charts displaying the response over time for each of the
sensors
Space for comments on the paper copy of the report
Field for signatures for performance and approval
216.
5 Operation
5.5 System installation test
5.5.3 The installation test report
1
1
, go to the Evaluation
Chapter 7 Trouble-
194

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AKTA readyflux and is the answer not in the manual?

Table of Contents

Save PDF