UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Module)
Step 10 Install anchor baffle plates around the cabinets.
Figure 4-191 Installing anchor baffle plates
----End
4.6.4.4 Top Cable Routing or Busway + Top Air Exhaust Configuration (with
Antiseismic Requirements)
● If the top air-flow cabinet is configured, installation against a wall is supported.
● The following procedure applies to installation against a wall. If cabinets are
Issue 07 (2022-11-29)
Figure 4-190 Securing the inductor cabinet
NO TICE
not installed against a wall and there is operation space at the rear of the
cabinets, you need to install the cabinet combination screws at the rear and the
anchor screws at the bottom.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Installation and Cable Connection
215