Top Cable Routing - Huawei UPS5000-H-800 kVA-NTN Quick Manual

Table of Contents

Advertisement

UPS5000-H-800 kVA-NTN
Quick Guide (480 V, 100 kVA Power Modules)

1.9.2 Top Cable Routing

Procedure
Step 1 Open the front door of the cabinet, remove the power distribution cover, and
remove the top cover as required.
Figure 1-50 Removing the covers
Step 2 Install ground cables.