Huawei UPS5000 User Manual

Optional bsc card
Hide thumbs Also See for UPS5000:

Advertisement

Quick Links

UPS5000 Optional BSC Card
User Manual
Issue
03
Date
2022-09-16
HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei UPS5000

  • Page 1 UPS5000 Optional BSC Card User Manual Issue Date 2022-09-16 HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei Digital Power Technologies Co., Ltd. and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    About This Document About This Document Purpose This document describes the UPS5000 optional BSC card in terms of the product overview, installation, and commissioning, helping readers understand how to use the product. Figures provided in this document are for reference only.
  • Page 4 Issue Date Description 2022-09-16 Added the procedure for installing an optional BSC card for the UPS5000-H. 2019-12-10 Updated the sampling cable. 2017-12-04 This issue is the first official release. Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 5: Table Of Contents

    2.3.2 Dual-bus System (UPS5000+Other Vendor's UPS)....................6 3 Installation..........................8 3.1 Unpacking and Checking..............................8 3.2 Installation Tools..................................8 3.3 Installation and Cable Connection (Multi-Bus System with UPS5000-Hs)............9 3.3.1 Cabling....................................10 3.3.2 Installation Process................................12 3.3.3 Installation and Cable Connection (400K/500K/600K/800K/1200K)...............12 3.3.4 Installation and Cable Connection (1600K)......................
  • Page 6: Safety Information

    ● Before handling the product, get tools insulated and take off metal articles such as watches and rings. Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 7: Product Overview

    2 Product Overview Product Overview 2.1 Application Scenarios 2.1.1 Multi-bus System (UPS5000-Hs) The UPS5000-Hs can be configured with optional BSC cards to form a multi-bus system. n (3 ≤ n ≤ 9) independent UPS systems. Each ● The multi-bus system consists of system can be a single UPS or multiple UPSs connected in parallel (the UPS X is subject to the user manual of the corresponding UPS model).
  • Page 8: Dual-Bus System (Ups5000+Other Vendor's Ups)

    2 Product Overview 2.1.2 Dual-bus System (UPS5000+Other Vendor's UPS) The optional BSC card enables the UPS5000 and other vendor's UPS to form a dual-bus system. With an optional BSC card, our UPS can function as a slave system to track the output phase of other vendor's UPS in real time.
  • Page 9 Installed on any UPS in the master system. (one input and two outputs) Cable Materials for preparing cables onsite. Single cord end terminal Phoenix terminal Twin cord end terminal Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 10 ● In the preceding figure, single cord end terminals, phoenix terminals, and twin cord end terminals are used to prepare cables. You are advised to prepare double the required amount as spare parts for onsite installation. Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 11: Dual-Bus System (Ups5000+Other Vendor's Ups)

    The quantity of terminals for preparing the cable end terminal (3) onsite is included. Phoenix 14120129 Configured only when the cable (3) delivered with terminal the product is not long enough. Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 12 In the preceding figure, single cord end terminals, phoenix terminals, and cord end terminals are used to prepare cables. You are advised to prepare double the required amount as spare parts for onsite installation. Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 13: Installation

    Check that the fittings comply with the packing list. If there is any discrepancy, keep a record and contact the supplier immediately. 3.2 Installation Tools Personal Protective Equipment Electrostatic Insulated gloves discharge (ESD) gloves Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 14: Installation And Cable Connection (Multi-Bus System With Ups5000-Hs)

    (M4/M5/M6) Cable Installation Tools Cord end terminal Cable cutter Wire stripper Diagonal pliers crimping tool Heat gun Measurement Instrument Multimeter 3.3 Installation and Cable Connection (Multi-Bus System with UPS5000-Hs) Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 15: Cabling

    Figure 3-2 Terminal positions (400K/500K/600K) (1) Output sampling terminal of the master (2) Terminal block of the master system system Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 16 (1) Output sampling terminal of the master (2) Terminal block of the master system system Figure 3-4 Terminal positions (1600K) (1) Output sampling terminal of the master (2) Terminal block of the master system system Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 17: Installation Process

    Step 2 Install an optional BSC card on any UPS in the slave system. Figure 3-6 Installing an optional BSC card Step 3 Install cables between an optional BSC card and ECMs. Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 18 Step 6 Install cables between output sampling terminals and terminal blocks. NO TICE The cables in the following figure need to be prepared onsite using the configured cables (BOM number: 25030395) and single cord end terminals (BOM number: 14170097). Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 19 2 PCS; 8-bus system: 3 PCS; 9-bus system: 4 PCS) onsite using the configured cables (BOM number: 25030395), twin cord end terminals (BOM number: 14170136), and phoenix terminals (BOM number: 14120129). Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 20: Installation And Cable Connection (1600K)

    Step 1 Connect the ground cable of the ESD wrist strap, and put on the ESD wrist strap and ESD gloves. Step 2 Install an optional BSC card on any UPS in the slave system. Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 21 If the guide rail is not long enough, remove one side panel from five terminal blocks. Ensure that the outermost terminal block has a side panel. Figure 3-14 Installing terminal blocks Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 22 2 PCS; 8-bus system: 3 PCS; 9-bus system: 4 PCS) onsite using the configured cables (BOM number: 25030395), twin cord end terminals (BOM number: 14170136), and phoenix terminals (BOM number: 14120129). Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 23: Installation And Cable Connection (Dual-Bus System With Other Vendor's Ups)

    (2) Twin cord end terminal (3) Terminal block of the master system (4) Optional BSC cards of the slave systems ----End 3.4 Installation and Cable Connection (Dual-Bus System with Other Vendor's UPS) Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 24: Cabling

    Step 1 Connect the ground cable of the ESD wrist strap, and put on the ESD wrist strap and ESD gloves. Step 2 Install an optional BSC card on any UPS in the slave system. Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 25 Step 5 Check that the output of other vendor's UPS is not energized. Step 6 Install cables between the optional BSC card, fuse box, and output sampling terminal of other vendor's UPS. Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 26 Figure 3-22 Installing sampling cables (1) Output sampling terminal (output phases (2) Fuse box U and N) of other vendor's UPS (3) Optional BSC card of the slave system ----End Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 27: Power-On Commissioning

    WebUI path: Monitoring > UPS System > Running Parameter > System Settings Step 4 Check that the valid phase voltage difference between UPS systems is less than 5 ----End Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 28: A Acronyms And Abbreviations

    UPS5000 Optional BSC Card User Manual A Acronyms and Abbreviations Acronyms and Abbreviations bus sync controller energy control module liquid crystal display uninterruptible power system Issue 03 (2022-09-16) Copyright © Huawei Digital Power Technologies Co., Ltd.