UPS5000-H-600 kVA-FTN
User Manual (Singapore, 100 kVA
Power Modules)
Issue
02
Date
2023-11-07
HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei UPS5000-H-600

  • Page 1 UPS5000-H-600 kVA-FTN User Manual (Singapore, 100 kVA Power Modules) Issue Date 2023-11-07 HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei Digital Power Technologies Co., Ltd. and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    User Manual (Singapore, 100 kVA Power Modules) About This Document About This Document Purpose This document describes the UPS5000-H-600 kVA-FTN in terms of product overview, installation, cable connections, single UPS commissioning, parallel system commissioning, and maintenance. Intended Audience This document is intended for: ●...
  • Page 4 ● Deleted the years from safety and EMC standards. ● Added 4.2.5 SPD. ● Updated the T/H sensor configuration table. 2022-11-18 This issue is the first official release. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 5: Table Of Contents

    2.7.3 Dry Contact Extended Card............................46 2.7.4 Backfeed Protection Card............................... 48 2.7.5 T/H Sensor................................... 49 2.7.6 PC Components for Rear Copper Bar Protection....................50 2.7.7 Bottom Cabling Cabinet..............................50 Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 6 4.10.4.2 Installation and Cable Connection........................109 4.10.5 Installing Parallel Cables............................111 4.11 Verifying the Installation............................... 113 4.12 Sealing Cabinets................................115 5 Single UPS Commissioning....................117 5.1 Powering On and Starting the UPS..........................117 Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 7 7.3.2.1 Performing a Shallow Discharge Test........................156 7.3.2.2 Performing a Capacity Test............................158 7.3.2.3 Performing a Group Capacity Test......................... 159 7.3.3 Downloading the Test Data............................160 8 Troubleshooting........................161 9 FAQ............................164 Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 8 9.3 Transferring from Maintenance Bypass Mode to Inverter Mode...............166 9.4 Performing EPO...................................166 9.5 Clearing the EPO State..............................167 9.6 Exporting Data..................................167 9.7 Obtaining Active Alarm Details............................. 169 A Lifting Trolley........................170 B Acronyms and Abbreviations................... 172 Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 9: Safety Information

    Equipment damage due to force majeure such as earthquakes, floods, volcanic eruptions, debris flows, lightning strikes, fires, wars, armed conflicts, typhoons, hurricanes, tornadoes, and extreme weather conditions ● Operation beyond the conditions specified in this document Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 10: Personal Safety

    D ANGER During operations, use dedicated insulated tools to prevent electric shocks or short circuits. The insulation and voltage resistance must comply with local laws, regulations, standards, and specifications. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 11 – Trained personnel: personnel who are trained in technology and safety, have required experience, are aware of possible hazards on themselves in Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 12: Equipment Safety

    Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 13: Battery Safety

    Do not expose batteries at high temperatures or around heat sources, such as scorching sunlight, fire sources, transformers, and heaters. Battery overheating may cause leakage, smoke, flammable gas release, thermal runaway, fire, or explosion. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 14 . To prevent fire or equipment corrosion, ensure that flammable gases are properly exhausted. D ANGER The gases generated by a burning battery may irritate your eyes, skin, and throat. Take protective measures. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 15 WARNING After batteries are discharged, charge them in time to avoid damage due to overdischarge. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 16 ● Batteries are damaged because you do not store them in accordance with storage requirements (for example, in an environment that is damp or prone to rain). Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 17 In the case of electrolyte leakage or structural deformation, contact the installer or professional O&M personnel immediately to remove or replace the battery. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 18 ● Skin contact: Wash the affected areas immediately with soap and water and seek immediate medical attention. ● Intake: Seek immediate medical attention. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 19: Electrical Safety

    Before connecting cables, ensure that the equipment is intact. Otherwise, electric shocks or fires may occur. D ANGER Non-standard and improper operations may result in fire or electric shocks. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 20 ● Before installing power cables, check that cable labels are correct and cable terminals are insulated. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 21 ● Ensure that the protective ground point of the equipment is reliably connected to the ground screw of the metal enclosure (connection resistance: ≤ 0.1 ohms). Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 22 Do not perform any improper operations, for example, dropping cables directly from a vehicle. Otherwise, the cable performance may deteriorate due to cable damage, which affects the current-carrying capacity and temperature rise. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 23: Environmental Requirements

    Do not expose the equipment to flammable or explosive gas or smoke. Do not perform any operation on the equipment in such environments. D ANGER Do not store any flammable or explosive materials in the equipment area. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 24 ● Ensure that the ground in the installation environment is solid, free from spongy or soft soil, and not prone to subsidence. The site must not be located Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 25: Mechanical Safety

    Do not use tools that have signs of scratches or fail to pass the inspection or whose inspection validity period has expired. Ensure that the tools are secure and not overloaded. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 26 If two persons or more move a heavy object together, ensure that the object is lifted and landed simultaneously and moved at a uniform pace under the supervision of one person. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 27 Only trained and qualified personnel are allowed to work at heights. ● Do not work at heights when steel pipes are wet or other risky situations exist. After the preceding conditions no longer exist, the safety owner and Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 28 Ensure that the ladder is securely positioned and held firm. ● When climbing up the ladder, keep your body stable and your center of gravity between the side rails, and do not overreach to the sides. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 29 During hoisting, do not stand or walk under the crane or the hoisted objects. ● Do not drag steel ropes and hoisting tools or bump hoisted objects against hard objects during hoisting. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 30 To avoid short circuits or other risks, do not drill holes into buried pipes or cables. ● When drilling holes, protect the equipment from shavings. After drilling, clean up any shavings. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 31: Product Overview

    Product subcategory H: high power density and high efficiency Rated capacity 600K: The output capacity is 600 kVA. Switch F: full configuration of switches, including the configuration input, output, and maintenance bypass switches Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 32: Application Scenarios

    If one power module is faulty, other power modules continue working. If loads are light, the UPS provides redundant capacity even if only a single UPS is operating, which ensures high reliability. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 33 UPS outputs to supply power to loads. If one UPS fails, another UPS continues supplying power to loads, which ensures system reliability. Figure 2-3 Typical application scenario of a 1+1 parallel system Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 34: Working Principle And Modes

    Intelligent control is adopted for modules. The power module consists of a rectifier, inverter, and DC/DC converter. The product converts inputs into pure high-quality sine wave outputs by using the high-frequency switching technology. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 35 The bypass power supply is not protected by the UPS and therefore is prone to the mains outage, abnormal AC voltage waveform, or abnormal frequency. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 36 In either bypass mode or inverter mode, the rectifier is started all the time and charges batteries using a charger. The ECO mode delivers a high efficiency. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 37: Product Configuration

    UPS Cabinet Inductor Cabinet Bottom Cabling Cabinet Top cable routing, rear air exhaust (three-phase three- wire) Bottom cable routing, rear air exhaust (three-phase three- wire) Figure 2-6 Product configuration Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 38: Cabinet Description

    2.6 Component Description 2.6.1 Power Module The power module consists of a power factor correction (PFC) rectifier and inverter. It performs AC/DC or DC/DC conversion on the mains and battery inputs, Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 39: Bypass Module

    ● Off: There is no critical alarm for the inverter or rectifier, or the software is being upgraded. 2.6.2 Bypass Module The UPS supplies power through the bypass under the following circumstances: Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 40 Fault ● Steady on: A critical alarm is generated for the indicator bypass. ● Off: No critical alarm is generated for the bypass, or the software is being upgraded. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 41: Mdu

    ● Off: The UPS display is not powered on. Man-machine interface MUS05A (DB26) Connects to the MDU and monitoring interface card. Network port. A shielded cable is required. Reserved RS485_1 Reserved FE_1 Reserved FE_2 Reserved Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 42: Control Module

    The ECM provides module working status information to the management system. ● The ECM controls the running of a single UPS and a parallel system, and reports the UPS status information to other monitoring modules. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 43 FAULT Fault ● Steady on: The ECM has a critical alarm. indicator ● Off: The ECM has no critical alarm or the software of the ECM is being upgraded. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 44: Dry Contact Card

    ● BTG port open: alarm. no battery ground grounding fault The value can be changed to Closed: ● BTG port open: battery grounding fault ● BTG port closed: no battery grounding fault Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 45 (NO) signal takes effect, the (EPO) port port is connected system will to the EPO_12V generate an EPO EPO_12V +12V port, EPO is alarm and stop triggered. supplying power. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 46 Open: parallel connection ● OUT port open: scenario. The PDC output switch is ON. ● OUT port closed: The PDC output switch is OFF. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 47 ON. alarm and transfer to static ● BP port closed: bypass mode. The bypass input switch or system maintenance switch is OFF. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 48: Monitoring Interface Card

    (MDU). ● The monitoring interface card provides the ambient temperature and humidity (T/H) sensor port, FE port, battery temperature monitoring port, and network management port. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 49 ● Connects to an ambient T/H sensor over two communications wires. port 1 ● Supported protocol: Modbus-RTU COM2 Southbound ● Connects to a southbound device. communications ● Supported protocol: Modbus-RTU port 2 Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 50 MDU port Connects to the MUS05A (DB26) port on the MDU for power supply and communication. Table 2-9 Pin definitions for the COM1 port Appearance COM1 Port RS485_R– RS485_R+ 12V_PORT Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 51: Intelligent Detection Card

    Figure 2-15 DO port wiring methods 2.6.4.4 Intelligent Detection Card The card detects the temperatures of copper bars for batteries, bypass input, mains input, and output. It is hot-swappable and 1 U high. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 52 Reserved FE_1 Reserved COM_OUT Reserved Table 2-11 Pin definitions for the FE_1 and COM_OUT ports Appearance FE_1 Port COM_OUT Port FE4_TX+ RS485+ FE4_TX- RS485- FE4_RX+ RS485+ RS485- FE4_RX- CANH Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 53: Optional Components

    BSC cable 10 m/15 m/60 m Transmits bus synchronization signals in a dual-bus system. Parallel cable 5 m/10 m/15 m Connects UPSs in parallel. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 54: Surge Protection Box

    ● A maximum of one dry contact extended card supported in the monitoring subrack. The card is hot swappable. Figure 2-18 Appearance Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 55 MUE07A DI_5 as required. The default value is None. DI_3 ● After the defined dry contact signals take effect, the system will be able to generate corresponding alarms. DI_4 DI_5 Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 56: Backfeed Protection Card

    NC and COM are BFP_NC normally closed contacts. When a backfeed occurs, the normally open contacts are closed and the normally closed contacts are open. RSV_NO Reserved (reserved) RSV_COM RSV_NC Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 57: T/H Sensor

    NTC1-3 NTC4 Definitio Definitio Definitio Defin ition RS485+ RS485+ NTC1 NTC4 RS485– RS485– 12 V DC 12 V DC Reserved Reser RS485+ RS485+ NTC2 NTC5 RS485– RS485– NTC3 NTC6 Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 58: Pc Components For Rear Copper Bar Protection

    (PC) 1 (with a label) 2.7.7 Bottom Cabling Cabinet It applies to the bottom cabling scenario. Figure 2-23 Appearance (1) Top enclosure frame (to be installed onsite) (2) Cabinet Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 59: Inductor Cabinet

    The top enclosure frame needs to be installed onsite only when cables are routed in from the top or bottom. 2.7.9 Inductor Cabinet PSU Inductor cabinet PSUs convert AC input power into stable DC power for the fans in the inductor cabinet. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 60 It is normal that the alarm indicator blinks at an interval of 2s (on for 1s and then off for 1s). ● Off: No alarm is generated. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 61 ● Steady on: indicator – The PSU locks out due to output overvoltage. – The PSU has no output due to an internal fault. ● Off: The PSU is normal. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 62: Technical Specifications

    Internal Switch Specifications Maintenance Bypass Mains Input Switch Bypass Input Switch Output Switch Switch 690 V AC/1250 A/3P 690 V AC/1250 A/3P 690 V AC/1250 A/3P 690 V AC/1250 A/3P Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 63 50/60 Hz±6 Hz (adjustable with a tolerance of 0.5–6 Hz, ±2 Hz by default) Input mode The mains input and bypass input share a power source (by default) or use different power sources. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 64 2 V battery cells (1.67 V/cell). battery) Battery cold start If a utility power outage occurs, batteries can start the UPS to supply power to loads. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 65 ● Double conversion mode: uninterrupted transfer 0 ms; interrupted transfer ≤ 5 ms Output voltage ● Voltage imbalance: ±1% imbalance ● Phase imbalance: 120±1° (balanced load and unbalanced load) Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 66 System Electrical Specifications Item Specifications Parallel system reliability Redundant parallel signals ECO in a parallel system Supported No-load loss 5.5 kW Number of parallel UPSs Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 67: Environmental Specifications

    IEC 62040-3.) 3.1.3 Safety Compliance and EMC Specifications Table 3-3 Safety compliance Safety Certification Standard EN 62040-1 IEC 62040-1 EN 62040-1 CQC3108 GB7260.1 YD/T2165 IEC 62040-2 Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 68: Component Specifications

    Table 3-5 Power module Item Specifications Rated output capacity 100 kVA/100 kW Dimensions (H x W x 130 mm x 442 mm x 750 mm Weight < 55 kg Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 69 ● Cabinet: 2000 mm x 400 mm x 1000 mm ● Top enclosure frame: 200 mm x 400 mm x 1000 mm Weight ● Cabinet: ≤ 550 kg ● Top enclosure frame: ≤ 8 kg Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 70: Installation And Cable Connection

    The optimal operating temperatures for valve-regulated lead-acid (VRLA) batteries are 20–30°C. Operating temperatures higher than 30°C shorten the battery lifespan, and operating temperatures lower than 20°C reduce the battery backup time. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 71 The distance between the bottom of the cable tray and the top of the cabinet must be at least 400 mm. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 72: Installation Preparations

    4.2 Installation Preparations 4.2.1 Tools The onsite operation personnel can select tools based on the site requirements. Personal Protective Equipment Safety helmet Goggles Protective shoes Reflective vest Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 73 Manual pallet Lifting trolley truck Hardware Installation Tools Flat-head Phillips insulated Insulated torque Hex key insulated torque torque socket wrench screwdriver screwdriver Including (M2.5) (M4/M5/M6) extended sockets (M8/M10/M12/ M16) Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 74 Utility knife Marker Rivet gun Insulated ladder Cable Installation Tools Cable cutter Wire stripper Diagonal pliers RJ45 crimping tool Electro-hydraulic Cord end terminal Heat gun Scissors pliers crimping tool Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 75 Thermometer Clamp meter Soft measuring Steel measuring Square tape tape Level Laptop Level gauge Multimeter Network tester Phase sequence Dielectric strength Megohmmeter meter tester Machinery Small cutter Cable reel Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 76 Cotton cloth Sandpaper Heat-shrink Insulation tape tubing Other Tools Electrician's knife Hacksaw Powder marker Glue gun Brush Paint brush Vacuum cleaner Flashlight Insulation pad SPD extracting Hole saw tool Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 77: Recommended Circuit Breakers

    Bypass input circuit breaker 1000 A/3P Downstream output circuit breaker 1000 A/3P a: recommended model when the short-circuit current where the circuit breaker is located is less than 65 kA Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 78: Power Cables

    IEC-60364-5-52 standard and SmartLi user manual ● When the mains input and bypass input share a power source, configure mains input power cables as input power cables. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 79: Power Cable Terminals

    Equipotential ground 4.2.4 Power Cable Terminals Table 4-3 Power terminal connection requirements Port Connection Method Bolt Bolt Length Torque Specifications Mains input Crimped DT terminal 55 mm 120 N·m Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 80: Spd

    Table 4-4 Cables for the dry contact card Name Specifications Quantity (PCS) Remarks Cable Double-insulated twisted cable. If the Several Provided by the cable length is within 25–50 m, the customer cross-sectional area must be 0.5–1.5 Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 81 Backfeed Protection Card Table 4-7 Configuration Name Appearance or Specifications Quantity Remarks (PCS) Backfeed Delivered with the protection card product 4-pin terminal Delivered with the block product Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 82 UPS Voltage System UPS Voltage Level Supply Voltage to Shunt Release Three-phase three-wire 380 V 230 V Three-phase three-wire 400 V 240 V Three-phase three-wire 415 V 250 V Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 83 Delivered with block the product Cable Double-insulated twisted cable. If the cable Several Provided by the length is within 25–50 m, the cross-sectional customer area must be 0.5–1.5 mm Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 84: Transportation, Unpacking, And Checking

    If there is any discrepancy, keep a record and contact the supplier immediately. Step 4 Remove the bolts that secure the cabinet to the pallet and move the cabinet from the pallet. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 85: Installation Process

    UPS5000-H-600 kVA-FTN User Manual (Singapore, 100 kVA Power Modules) 4 Installation and Cable Connection Figure 4-4 Removing the pallet ----End 4.4 Installation Process Figure 4-5 Installation process Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 86: Installing Pc Components For Rear Copper Bar Protection

    Step 1 Remove the UPS rear door panels. Step 2 Install copper bar protection components. Figure 4-6 Installing copper bar protection components Step 3 Reinstall the UPS rear door panels. ----End 4.6 Installing Cabinets Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 87: Top Cable Routing

    Knock the expansion bolt into the hole until the expansion tube completely fits into the hole. The expansion sleeve must be completely buried under the ground to facilitate subsequent installation. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 88 Remove the front panel from the bottom cabling cabinet. Remove certain front covers and the rear door panel from the inductor cabinet. Figure 4-9 Removing certain covers Combine the cabinets. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 89 4 Installation and Cable Connection Figure 4-10 Combining cabinets Step 6 Secure the cabinets to the floor. Figure 4-11 Securing the cabinets Step 7 Install anchor baffle plates around the cabinets. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 90 Figure 4-13 Hole positions on the channel steel (optional) (1) Hole positions on the channel steel Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 91: Bottom Cable Routing

    Partially tighten the expansion bolt and vertically insert it into the hole. Knock the expansion bolt using a rubber mallet until the expansion sleeve is fully inserted into the hole. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 92 (1) M12x60 bolt (2) Spring washer (3) Flat washer (4) Expansion sleeve (5) Expansion nut (6) Concrete floor Step 3 Remove the UPS cabinet side panels. Figure 4-16 Removing side panels Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 93 Remove the front panel from the bottom cabling cabinet. Remove certain front covers and the rear door panel from the inductor cabinet. Figure 4-17 Removing certain covers Combine the cabinets. Figure 4-18 Combining cabinets Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 94 ● Ensure that the surface of channel steel is level. Step 1 Determine the cabinet installation position on the channel steel based on the mounting holes in the marking-off template or the hole dimensions diagram. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 95: Installing Inductor Cabinet Psus

    Pull out the handle. Insert the PSU into the slot and push it along the guide rails until it is in position. Push the handle in place and lock it. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 96: Installing Cables

    ● Prepare terminals onsite. The length of the copper wire stripped should be the same as that of the part of the terminal that covers the conductor. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 97: Top Cable Routing

    Step 1 Remove the top cover (you do not need to reinstall it later). Figure 4-24 Removing the cover Step 2 Remove the epoxy separators between the top copper bars. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 98 ● Cables must be bound to the nearest beam or cable bridge according to the route shown in the following figure. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 99 When installing AC input power cables, if there are a great number of cables and the wiring holes in the mains input copper bar are insufficient, connect the cables to the corresponding holes in the bypass input copper bar. ● One power source Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 100 (2) AC input power cables (3) Output power cables (U, (L1–L3) V, W) ● Two power sources Figure 4-29 Removing the copper bars of the same power source for mains and bypass inputs Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 101 Step 7 Arrange cables, install the top beams (delivered with the product) on the top cover, and separate the mains input cables, bypass input cables, and output cables from each other. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 102 Remove the power distribution cover from the UPS cabinet. Figure 4-33 Removing the power distribution cover Install signal cables. NO TICE Do not bind signal cables and power cables together. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 103 ● Do not bind signal cables and power cables together. ● RS485 cables and FE cables must be shielded cables. ● The figure uses the cable connection between the UPS and the SmartLi as an example. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 104: Bottom Cable Routing

    Step 1 Remove the top cover (you do not need to reinstall it later). Figure 4-36 Removing the cover Step 2 Remove the bottom cabling cover from the bottom cabling cabinet. Step 3 Remove the epoxy separators between the top copper bars. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 105 Figure 4-37 Removing epoxy separators Step 4 Install ground cables. Figure 4-38 Installing ground cables (1) PE (2) Equipotential ground Step 5 Install power cables from the inductor cabinet to the UPS. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 106 When installing AC input power cables, if there are a great number of cables and the wiring holes in the mains input copper bar are insufficient, connect the cables to the corresponding holes in the bypass input copper bar. ● One power source Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 107 4 Installation and Cable Connection Figure 4-40 Installing cables ● Two power sources Figure 4-41 Removing the copper bars of the same power source for mains and bypass inputs Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 108 4 Installation and Cable Connection Figure 4-42 Installing cables Step 7 Reinstall the epoxy separators between the copper bars on the top of the UPS cabinet. Figure 4-43 Reinstalling the epoxy separators Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 109 Step 9 Install signal cables from the inductor cabinet to the UPS. Remove the power distribution cover from the UPS cabinet. Figure 4-45 Removing the power distribution cover Install signal cables. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 110 ● Do not bind signal cables and power cables together. ● RS485 cables and FE cables must be shielded cables. ● The figure uses the cable connection between the UPS and the SmartLi as an example. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 111: Installing A Top Enclosure Frame

    Step 1 Remove the connecting kits from both sides of the cabinet top. Figure 4-48 Removing cabinet connecting kits Step 2 Install a top enclosure frame on the top of the UPS cabinet. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 112 Figure 4-50 Installing a top enclosure frame for the inductor cabinet Step 4 Install mounting plates at the front and rear of the top enclosure frame of the UPS cabinet. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 113: Installing Optional Components

    UPS mains input. To power off the UPS completely, turn off the upstream input switch when you trigger EPO. ● Set remote EPO for the UPS separately. The UPS cannot share switch contacts with other devices. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 114: Installing T/H Sensors And Cables

    Connect the RS485-OUT port on the T/H sensor to the RS485-IN port on another T/H sensor. NO TICE COM1 is a 6-pin port. Use a communications cable with a connector of 6–8 pins. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 115: Installing A Dry Contact Extended Card

    (An ECM expansion subrack is required, which is installed before delivery.) Figure 4-57 Position of the dry contact extended card (1) Dry contact extended card Step 2 Connect cables to DO ports in either of the following ways. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 116: Installing A Backfeed Protection Card

    If a backfeed protection card has been configured, perform the following steps to install it. 4.10.4.1 Cable Routing Figure 4-59 Cable routing if the UPS is used for power supply (1) Fuse terminal (2) Backfeed protection card Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 117: Installation And Cable Connection

    If both a backfeed protection card and a dry contact extended card are configured (An ECM expansion subrack is required, which is installed before delivery.) Figure 4-62 Position of the backfeed protection card (1) Backfeed protection card Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 118 If a more reliable third-party power supply is used, use the power signal with a voltage of 240 V AC or less and a current of less than 6 A. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 119: Installing Parallel Cables

    Step 2 Choose a parallel mode and connect power cables to the parallel system based on site requirements. The typical scenario of a 1+1 parallel system is used as an example. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 120 A dual-bus parallel system consisting of two parallel subsystems is used as an example. Figure 4-66 Conceptual diagram of a dual-bus parallel system Step 3 Pre-route the UPS parallel cables and place the parallel cable connectors near the PARALLEL ports. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 121: Verifying The Installation

    Labels on the busway and Both ends of a busway and cable are cables labeled. Labels are concise and easy to understand. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 122 The dust covers on the cabinets are intact. Any damaged air filter should be replaced promptly. Do not remove the dust covers during construction or before power-on. Otherwise, the equipment may be damaged. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 123: Sealing Cabinets

    Figure 4-68 Filling a gap with sealing putty (1) Paper protective film (2) Transparent film (3) Sealing putty (with the transparent film facing upward) Step 3 Reinstall all covers. Step 4 Close the cabinet doors. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 124 Remove the cover only when the device is ready for operation. Otherwise, device faults may occur. Figure 4-69 Dust cover (1) Top dust cover (if any) (2) Rear dust cover (3) Front dust cover ----End Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 125: Single Ups Commissioning

    Insert the switch handle in place, and then rotate the switch handle. Pull out the switch handle and place it back on the tray of the front door. Ensure that the triangle arrow on the flange points to ON. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 126: Initial Startup

    Technical support engineers can obtain the service authorization code through the Data Center Facility Deployment Guide . app. For details, see the Step 2 If the software version is incompatible, activate the software version as instructed on the LCD. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 127 ● Set Output frequency correctly. Otherwise, loads may be affected and the UPS may not work properly. ● Set all battery parameters correctly based on site requirements. Battery parameter settings are critical to battery maintenance, battery lifespan, and UPS discharge time. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 128 Step 4 After you set parameters on the Settings Wizard screen, the system displays the Bypass mode and No battery alarms, which do not need to be handled. Other alarms need to be handled. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 129: Starting The Inverter

    ----End Starting the Inverter on the WebUI Step 1 Open a browser (Chrome, Firefox, and Edge are supported). Take Edge as an example. Choose More tools > Internet options. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 130: Powering On Loads

    A BCB box is installed. Procedure Step 1 Choose System Info > Settings > Dry Contact Set, set MUE05A connection to Enable, and set BCB connection [OL] and Battery breaker [STA] to Enable. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 131: Setting The T/H Sensor

    A DIP switch has six binary toggle switches. The bit on the leftmost is the most significant bit, and the bit on the rightmost is the least significant bit. Bit 1 indicates ON, and bit 0 indicates OFF. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 132 LCD: Choose System Info > Settings > Comm. Settings > Amb. T/H Sensor, and set Start address and Quantity. WebUI: Choose System Settings > Comm. Settings > Amb. T/H Sensor, and set Start address and Quantity. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 133: Setting Parameters For The Backfeed Protection Card

    Prerequisites The UPS is working in inverter mode. Context ● The UPS is set to non-ECO mode by default. Set the UPS to ECO mode when it is required. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 134 When the bypass is abnormal, the UPS transfers to inverter mode immediately. If the inverter is not started, the UPS stops supplying power when the bypass is abnormal, and the system may power off. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 135: Setting The Hibernation Mode

    System Settings, and set Paral sys hibernate to Enable. Step 2 Set Module cycle hiber period(d) to an integer ranging from 1 to 100. The default value is 30. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 136 WebUI: Inverter hibernation is displayed on the home page. You can choose Monitoring > Module Summary > Module N > Running Information to view the running data of the module. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 137: Setting The Peak Shaving Mode

    5.1.6.3 Setting the Peak Shaving Mode Prerequisites ● The peak shaving mode is supported only when the UPS works in normal mode and SmartLi batteries (lithium batteries developed by Huawei) are connected. ● Before the system switches from normal mode to peak shaving mode, the SOC value of lithium batteries must reach 100%.
  • Page 138 Enable, related parameters are set, and configuration files are imported, active charging and discharging management can be implemented based on the peak and off-peak electricity price periods to save energy. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 139 ● The start time of the current period must be earlier than the end time. ● The current period must not overlap with other periods. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 140 When the battery backup time is greater than the preset value, the system continues to implement peak shaving based on the preset rules. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 141 The parameter settings must meet the verification rules of the template. Otherwise, a Bin file cannot be generated. Save the electricity price template and generate a 2.0 Bin file. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 142: Shutting Down And Powering Off The Ups

    Procedure Step 1 Shut down the inverter. ● Shutting down the inverter on the LCD Choose Common Functions > Inv. OFF. After confirmation, the inverter is shut down. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 143 Step 3 Switch off the battery string circuit breaker. If there are multiple battery strings, switch off the general circuit breaker between battery strings and the UPS and then switch off the circuit breaker for each battery string. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 144 Switches share one switch handle. Take out the handle when you operate different switches and reinstall it after the operations are complete. Step 5 Turn off the upstream mains and bypass input switches. ----End Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 145: Parallel System Commissioning

    0570-002 BPM unit abnormal. In this case, you need to power off the rack to clear the alarm. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 146 UPSs, or remove the general EPO switch. If a single UPS is not powered off after commissioning, verify on the monitoring screen that EPO has been activated successfully. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 147 Step 6 Set parallel parameters for each UPS. System Settings: On the LCD, choose System Info > Settings > System Settings. Alternatively, on the WebUI, choose Monitoring > UPS System > Running Parameter > System Settings. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 148 Perform the same operations on phases B and C. Complete the measurement between every two UPSs in the parallel system. If the phase sequence is correct and the voltage difference is less than 5 V, perform the subsequent Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 149 UPS.) Use a multimeter to measure the voltage where the battery switch is located (if there are multiple battery strings, use a multimeter to measure the voltage Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 150: Shutting Down And Powering Off A Parallel System

    6.3 Performing EPO Procedure Step 1 Press the EPO switches connected to the dry contact cards on all UPSs one by one or press the general EPO switch. ----End Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 151: Commissioning A Dual-Bus System

    For details, see 6.1 Starting a Parallel System. Step 3 Set each UPS in the system that is defined as the master system to BSC master system. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 152 On the LCD, choose System Info > Settings > System Settings and set BSC master/slave mode to BSC slave system Step 5 Check that the RMS phase voltage difference between UPS systems is less than 5 ----End Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 153: Maintenance

    Do not use wet cloth to clean exposed copper bars or other conductive parts. D ANGER Do not use water or any solvent to clean the equipment. D ANGER Do not remove the safety valve or fill anything into batteries. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 154 ● When moving batteries, do not place batteries upside down. Handle them gently, and pay attention to personal safety. ● Keep the battery switch off when installing or replacing batteries. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 155: Ups Maintenance

    ● If the output voltage is (tolerance ± 1%, line abnormal, check the UPS voltage) running status and check whether an alarm is ● Input frequency: 40–70 Hz generated. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 156: Quarterly Maintenance

    ● Replace cables. terminals (between the cables are intact and ● Secure all output UPS and the power terminals are free from terminals. distribution cabinet) black marks and noticeable sparks. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 157: Lead-Acid Battery Maintenance

    Do not smoke or use an open flame around batteries. ● After batteries are discharged, charge them in time to avoid affecting their lifespan. ● Only professionals are allowed to perform the maintenance tasks. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 158: Monthly Maintenance

    2. Check whether the equalized charging voltage and float charging voltage are correctly set for the UPS. 3. If the fault persists, contact technical support. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 159: Quarterly Maintenance

    3. If the fault persists, contact technical support. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 160: Annual Maintenance

    After checking that the battery screws meet the requirements, mark the screws for later check.) 7.3 Testing Batteries 7.3.1 Lead-Acid Battery Test Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 161: Performing A Forced Equalized Charging Test

    This item allows you to partially discharge batteries. A shallow discharge test is conducted to test the battery loop reliability and short-time discharge capacity when the batteries have not been discharged for a long time. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 162 Step 1 On the home screen of the LCD, choose System Info > Maintenance > Battery Maint. Step 2 Tap Start on the right of Shallow Dis. Test to start a shallow discharge test. Figure 7-2 Starting a shallow discharge test Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 163: Performing A Capacity Test

    Step 1 On the home screen of the LCD, choose System Info > Maintenance > Battery Maint. Step 2 Tap Start on the right of Capacity Test to start a capacity test. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 164: Lithium Battery Test

    No generator is connected to the UPS. ● The mains, batteries, charger, and discharger are normal. No overload alarm is generated. ● The SmartLi generates no alarms related to lithium batteries. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 165 ● The battery discharge capacity reaches the specified value (10%–50%, 20% by default). ● The discharge voltage reaches the warning threshold (calculated in real time). ● The load rate fluctuation exceeds 10%. ● An alarm is generated. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 166: Performing A Capacity Test

    The test is complete when the lowest cell voltage reaches the undervoltage alarm threshold. The test data is obtained from the capacity test. Save the test data obtained from the latest 36 tests. ----End Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 167: Performing A Group Capacity Test

    Step 1 On the home screen of the LCD, choose System Info > Maintenance > Battery Maint. Step 2 Tap Start on the right of Group Capacity Test to start a group capacity test. Figure 7-6 Starting a group capacity test Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 168: Downloading The Test Data

    Log drop-down list box, and click Query. Figure 7-7 Battery Test Records Step 2 Choose logs that have been queried from the Log drop-down list box, and click Export. ----End Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 169: Troubleshooting

    EOD voltage and 11.3 V/cell. For details about how to rectify common faults, see Table 8-1. If any UPS5000 Alarm Reference or contact technical unmentioned faults occur, see the support. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 170 The buzzer buzzes, The bypass thyristor Replace the bypass bypass is and the fault is damaged. module. abnormal indicator is on. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 171 The bypass module Reduce the load, or experiences improve ventilation. overtemperature. NO TE For details about component replacement and maintenance involved in Troubleshooting and UPS5000 Alarm Reference, consult maintenance engineers. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 172: Faq

    Step 4 Use a multimeter to measure the voltages of the positive and negative battery strings connected to the UPS battery input terminals. If the measured values are Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 173: Transferring To Maintenance Bypass Mode

    LCD. Step 4 Turn on the maintenance bypass switch for external power distribution. Then, the PDC Maint. breaker closed and Bypass mode alarms are displayed on the LCD. ----End Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 174: Transferring From Maintenance Bypass Mode To Inverter Mode

    ● After you press the EPO switch, the UPS supplies no power, and the loads powers off. ● If the UPS is in maintenance bypass mode, the UPS still supplies power after you press the EPO switch. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 175: Clearing The Epo State

    Choose Home > Active Alarm to check that the EPO alarm has been cleared. Step 4 Start the inverter. ----End 9.6 Exporting Data Prerequisites To export data from the WebUI, you need to log in to the WebUI. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 176 Figure 9-4 Export Fault Information ● Exporting e-labels Choose Maintenance > E-Label, click Export All in the lower left corner, and specify a path to save the exported data. Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 177: Obtaining Active Alarm Details

    9.7 Obtaining Active Alarm Details Choose System Info > Alarms > Active Alarms on the LCD, and tap an alarm ID to view the alarm details. Figure 9-6 Active Alarms Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 178: A Lifting Trolley

    You can decide whether to choose it based on site requirements. Appearance Figure A-1 Lifting trolley (1) Tabletop (2) Handle (3) Lowering switch (4) Elevating pedal (5) Foot brake Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 179 Step 3 Repeatedly step on the elevating pedal to raise the tabletop to a proper height. Step 4 Lift the lowering switch to slowly lower the tabletop to the required height. ----End Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 180: B Acronyms And Abbreviations

    American wire gauge bus synchronization controller BCB-BOX battery circuit breaker BBB-BOX battery bus bar box Conformite Europeenne economic control operation emergency power off energy control module end of discharge Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 181 RS485 Recommended Standard state of charge static transfer switch SNMP Simple Network Management Protocol S-ECO super economy control operation Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 182 THDv total harmonic distortion of output voltage uninterruptible power system Universal Serial Bus VRLA valve-regulated lead- acid battery voltage frequency independent voltage frequency dependent voltage independent Issue 02 (2023-11-07) Copyright © Huawei Digital Power Technologies Co., Ltd.

Table of Contents