Top Cable Routing Or Busway + Rear Air Exhaust Configuration - Huawei UPS5000-H-1200K-NT User Manual

Hide thumbs Also See for UPS5000-H-1200K-NT:
Table of Contents

Advertisement

UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Module)

4.6.2.1 Top Cable Routing or Busway + Rear Air Exhaust Configuration

Installation on the Floor
● Ensure that the floor is level.
● The customer needs to purchase the expansion bolts used for securing the
Step 1 Determine the cabinet installation position on the floor based on the mounting
holes in the marking-off template.
Figure 4-57 Hole dimensions (unit: mm)
(A) Mounting holes on the
channel steel
(1) UPS cabinet
Step 2 Install expansion sleeves for expansion bolts.
1.
2.
3.
4.
Knock the expansion bolt into the hole until the expansion tube completely fits
into the hole. The expansion sleeve must be completely buried under the ground
to facilitate subsequent installation.
Issue 07 (2022-11-29)
NO TICE
cabinet.
Drill a hole into the concrete floor using a hammer drill.
Partially tighten the expansion bolt and vertically insert it into the hole. Knock
the expansion bolt using a rubber mallet until the expansion sleeve is fully
inserted into the hole.
Tighten the expansion bolt.
Remove the bolt, spring washer, and flat washer.
NO TICE
Copyright © Huawei Digital Power Technologies Co., Ltd.
(B) Mounting holes on the
floor
(2) Inductor cabinet
4 Installation and Cable Connection
(C) Front door direction of the
cabinet
136

Advertisement

Table of Contents
loading

Table of Contents