Step 4 (Optional) If the nuts cannot be placed on the side of the channel steel, drill holes
near the mounting holes on the side of the channel steel to place the nuts for
securing the cabinet.
Figure 1-30 Hole positions on the channel steel
(1) Channel steel
Step 5 Secure the cabinet to the channel steel.
Step 6 Install anchor baffle plates around the cabinet.
----End
1.6.4 Top Cable Routing + Top Air Exhaust Configuration (with
Antiseismic Requirements)
● If the top outlet kit and the fasteners for installation against a wall are
● The following procedure applies to installation against a wall. If cabinets are
Issue 01 (2023-03-20)
NO TE
● In this example, one cabinet is installed not against a wall on C-channel steel with the
openings facing downwards.
● The channel steel model, installation mode, whether holes need to be drilled on a side,
hole size, and the number of cabinets are subject to the site survey data.
NO TICE
configured, cabinets can be installed against a wall and meet antiseismic
requirements.
not installed against a wall and there is operation space at the rear of the
cabinets, you need to install the cabinet combination screws at the rear and the
anchor screws at the bottom.