UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Module)
Figure 4-123 Hole dimensions (unit: mm)
(A) Mounting holes on the
channel steel
(1) Top air-flow cabinet
(4) Bypass cabinet
Step 2 Install expansion sleeves for expansion bolts.
1.
2.
3.
4.
Knock the expansion bolt into the hole until the expansion tube completely fits
into the hole. The expansion sleeve must be completely buried under the ground
to facilitate subsequent installation.
Issue 07 (2022-11-29)
Drill a hole into the concrete floor using a hammer drill.
Partially tighten the expansion bolt and vertically insert it into the hole. Knock
the expansion bolt using a rubber mallet until the expansion sleeve is fully
inserted into the hole.
Tighten the expansion bolt.
Remove the bolt, spring washer, and flat washer.
NO TICE
Copyright © Huawei Digital Power Technologies Co., Ltd.
(B) Mounting holes on the
floor
(2) Power cabinet 1
4 Installation and Cable Connection
(C) Front door direction of the
cabinet
(3) Power cabinet 2
177