UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Module)
Step 1 Determine the cabinet installation position on the channel steel based on the
mounting holes in the marking-off template or the hole dimensions diagram.
Step 2 Drill mounting holes on the channel steel using a hammer drill.
Step 3 Secure the floor mounting kits to the channel steel.
Step 4 Secure the rear anchor fasteners to the rear anchors of the cabinet.
Step 5 You are advised to use an electric pallet truck to move the cabinet to the
mounting holes on the channel steel.
If the nuts cannot be placed on the side of the channel steel, drill holes near the
mounting holes on the side of the channel steel to place the nuts for securing the
cabinet.
Figure 4-105 Hole positions on the channel steel (optional)
(1) Hole positions on the channel steel
Step 6 Insert and tighten the T-shaped bolts.
Step 7 Secure the cabinet to the channel steel.
Step 8 Install anchor baffle plates around the cabinet.
----End

4.6.3 1600K, Three-Phase Four-Wire

4.6.3.1 Top Cable Routing or Busway + Rear Air Exhaust Configuration

Context
Power cabinet 1 is transported separately, and power cabinet 2 and the bypass
cabinet are transported together.
Issue 07 (2022-11-29)
NO TE
● In this example, one cabinet is installed not against a wall on C-channel steel with the
openings facing downwards.
● The channel steel model, installation mode, whether holes need to be drilled on a side,
hole size, and the number of cabinets are subject to the site survey data.