Figure 4-284 Installing a signal cable between the UPS and the SmartLi
(1) Monitoring interface unit in the master SmartLi cabinet
----End
4.9.3.3 Bottom Cable Routing
Context
Figure 4-285 Copper bar positions
(1) Battery input
(4) UPS output
Procedure
Step 1 Remove the bottom cabling cover from the bottom cabling cabinet.
Step 2 Install equipotential ground cable for cabinets.
Issue 07 (2022-11-29)
Copyright © Huawei Digital Power Technologies Co., Ltd.
(2) Mains input
(5) Bypass input
4 Installation and Cable Connection
(3) Battery PE