Huawei UPS5000-H-1200K-NT User Manual page 275

Hide thumbs Also See for UPS5000-H-1200K-NT:
Table of Contents

Advertisement

UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Module)
Step 5 Install battery cables.
Figure 4-282 Installing power cables between the UPS and the SmartLi
(1) Connect the ground cable of the battery string or its BBB box to the battery PE of the UPS
or the ground bar in the equipment room based on the site survey.
Step 6 (Perform this step only for the top air-flow configuration.) Install cables for the
top air-flow cabinet.
1.
2.
3.
Issue 07 (2022-11-29)
Figure 4-281 Installing AC power cables
NO TE
The number and colors of cables are for reference only.
The figure uses the cable connection between the UPS and the SmartLi as an example.
Battery cables are connected to each SmartLi.
Remove the front cover from the UPS.
Remove an accessory cover from the top of the top air-flow cabinet.
Connect the power cable to the 380~480V System port on the UPS and the
signal cable to the XS2 port.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Installation and Cable Connection
266

Advertisement

Table of Contents
loading

Table of Contents