UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Module)
Figure 4-396 Installing the mounting plates
Step 3 Install top covers for the UPS cabinet and bottom cabling cabinet.
Figure 4-397 Installing covers
----End
4.10.4 1600K, Three-Phase Three-Wire
4.10.4.1 Top Cable Routing
Step 1 Remove the connecting kits from both sides of the cabinet top.
Figure 4-398 Removing cabinet connecting kits
Step 2 Remove the connecting kits from both sides of the inductor cabinet top.
Issue 07 (2022-11-29)
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Installation and Cable Connection
331