UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Module)
Figure 4-111 Securing cabinets
Step 7 Install anchor baffle plates around the cabinets.
Figure 4-112 Installing anchor baffle plates
----End
Installation on Channel Steel
● The Company does not provide channel steel or expansion bolts used for
● Ensure that the surface of channel steel is level.
Step 1 Determine the cabinet installation position on the channel steel based on the
mounting holes in the marking-off template or the hole dimensions diagram.
Step 2 Drill mounting holes on the channel steel using a hammer drill.
Issue 07 (2022-11-29)
NO TICE
securing channel steel. It is recommended that the customer purchase at least
50 mm wide channel steel.