Setting Parameters For Optional Components; Setting Bcb Parameters; Setting The T/H Sensor - Huawei UPS5000-H-1200K-NT User Manual

Hide thumbs Also See for UPS5000-H-1200K-NT:
Table of Contents

Advertisement

UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Module)
Step 4 If the system has connected to the remote EPO switch, you need to choose
Monitoring > UPS System > Running Parameter > System Settings on the
WebUI and set EPO detection to Enable.
Step 5 View the system running status diagram on the LCD to check that the UPS is
working in bypass mode.
----End

5.1.3 Setting Parameters for Optional Components

5.1.3.1 Setting BCB Parameters

Prerequisites
A BCB box is installed.
Procedure
Step 1 Choose System Info > Settings > Dry Contact Set, set MUE05A connection to
Enable, and set BCB connection [OL] and Battery breaker [STA] to Enable.
Figure 5-2 BCB connection settings
----End

5.1.3.2 Setting the T/H Sensor

Issue 07 (2022-11-29)
NO TE
● After you set parameters on the Settings Wizard screen, choose System Info > Settings
> System Settings. Check that Requisite modules and Redundant modules match the
actual values.
● If dry contact signals are connected to the system, choose System Info > Settings > Dry
Contact Set. Check that the connected dry contacts have been enabled and that the
disconnected dry contacts have been disabled.
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Single UPS Commissioning
354