Top Cable Routing Or Busway + Top Air Exhaust Configuration (With Antiseismic Requirements) - Huawei UPS5000-H-1200K-NT User Manual

Hide thumbs Also See for UPS5000-H-1200K-NT:
Table of Contents

Advertisement

UPS5000-H-(1200 kVA-1600 kVA)
User Manual (100 kVA Power Module)
4.
5.
Step 8 Install anchor baffle plates around the cabinets.
Figure 4-135 Installing anchor baffle plates
----End
4.6.3.4 Top Cable Routing or Busway + Top Air Exhaust Configuration (with
Antiseismic Requirements)
● If the top air-flow cabinet is configured, installation against a wall is supported.
● The following procedure applies to installation against a wall. If cabinets are
Issue 07 (2022-11-29)
Figure 4-134 Tightening the anchor bolts
Reinstall the power distribution cover and bottom cover.
Install the removed side panel on the side of the top air-flow cabinet.
NO TICE
not installed against a wall and there is operation space at the rear of the
cabinets, you need to install the cabinet combination screws at the rear and the
anchor screws at the bottom.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Installation and Cable Connection
183