Table 27: Site Preparation Checklist
Item or Task
Rack or Cabinet
Verify that the rack or cabinet
meets the minimum requirements
for installing the switch.
Plan rack or cabinet location,
including required space
clearances.
Secure the rack or cabinet to the
floor and building structure.
Cables
Acquire cables and connectors:
•
Determine the number of
cables needed based on your
planned configuration.
•
Review the maximum distance
allowed for each cable. Choose
the length of the cable based
on the distance between the
hardware components being
connected.
Plan the cable routing and
management.
Wall
(Continued)
For More Information
•
"Rack Requirements" on page
90
•
"Cabinet Requirements" on page
92
Performed By
Date
86