Qiagen EZ2 Connect MDx User Manual page 124

Hide thumbs Also See for EZ2 Connect MDx:
Table of Contents

Advertisement

Figure 124. Load check failed screen.
Skip load check Option
The first load check is mandatory and cannot be skipped in the Run setup selection overview dialog.
Following failure of the first load check the operator has an option to skip the load check and
proceed with protocol start by first tapping the back button to return to the Load the holder screen.
When using this option, it is the responsibility of the operator to visually check to confirm correct
placement of ALL consumables in ALL worktable positions in accordance with the instructions
detailed in the loading the worktable GUI wizard. It is recommended to perform this check while
the Load check failed screen (Figure 123) is still open. If you press Back, the information about the
failed positions will not be visible again. Once correct loading is confirmed, tap Next to proceed
to the Run setup selection overview screen where the Skip load check button will now be available.
EZ2 Connect MDx User Manual 05/2022
124

Advertisement

Table of Contents
loading

This manual is also suitable for:

9003230

Table of Contents