Loading The Tip Rack - Qiagen EZ2 Connect MDx User Manual

Hide thumbs Also See for EZ2 Connect MDx:
Table of Contents

Advertisement

5.4.6

Loading the tip rack

Remove the tip rack from the instrument and place it safely onto the bench. See the Loading and
unloading the tip rack section (see page 131).
The Load the tip rack steps (see page 131) features instructions on how to load the tip rack. To
highlight a position on the tip rack diagram and the corresponding row in the table, tap the position
or the table row.
Important: Read the instructions carefully before loading the rack, and make sure to follow all
directions including those in the respective kit handbook.
Figure 103. Load the tip rack step.
Note: In some applications, not all positions of the labware holder are to be used. This is indicated
by the lack of this position on the left-hand side and a white circle on the right-hand side.
EZ2 Connect MDx User Manual 05/2022
110

Advertisement

Table of Contents
loading

This manual is also suitable for:

9003230

Table of Contents