To start the run and view its progress, follow the steps below:
1. Tap Next in the Load the tip rack step. The Run setup selection overview dialog is shown.
Figure 119. Run setup selection overview dialog.
2. If all the information in the overview is correct, tap Start to immediately proceed with the
protocol run. To make modifications to any of the selections, tap Return to go back to the run
setup.
Note: The Estimated run time does not include the time to complete the Load Check, which is
approximately 6 minutes.
3. If the hood of the instrument is open, close it and the run will start.
Figure 120. Close the hood dialog.
EZ2 Connect MDx User Manual 05/2022
119