End Of The Protocol Run - Qiagen EZ2 Connect MDx User Manual

Hide thumbs Also See for EZ2 Connect MDx:
Table of Contents

Advertisement

When an operator chooses to use the skip load check option following a previously failed load
check, this will be recorded in the run report and all samples will be flagged as invalid.
If you find positions with wrong loading, you have to press the Back button until you reach the Select
sample positions screen. This will unlock the hood and allow correction of the wrong positions.
Note: If the operator goes back to the Select sample positions screen (standard workflow) or Scan
sample ID screen (LIMS workflow), the load check will again be mandatory.
5.7

End of the protocol run

When the protocol has successfully finished, the Protocol run completed screen is shown.
Information about required cleanup/maintenance steps is also displayed. First, remove the eluates
and store them according to the kit handbook of the used application. Follow the instructions to
properly remove all labware from the instrument and clean the piercing unit, see the After run
maintenance section (see page 145). If after run maintenance is completed, tap the check box to
transfer the maintenance status into the run report. Tap Finish to end the run, to create the report
file and go back to the Home screen. After a run is finished, a run report is generated. For more
information on how to save and download a run report, refer to the Saving a run report section
(page 128).
Figure 127. Protocol run completed screen.
EZ2 Connect MDx User Manual 05/2022
126

Advertisement

Table of Contents
loading

This manual is also suitable for:

9003230

Table of Contents