Installing an LFF non-hot-plug drive

Prerequisites
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
Procedure
1.
Power down the server.
2.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3.
Disconnect all peripheral cables from the server.
4.
Do one of the following:
Server in rack mode: Remove the server from the rack.
Server in tower mode: Position the tower server for hardware configuration.
5.
Remove the access panel.
6.
Remove the front bezel.
7.
Remove the PCI air baffle.
8.
Remove the system air baffle.
9.
Disconnected all existing drive cage cables.
10. Remove the installed drive cage.
11. Use the screws on the non-hot-plug drive cage to install the drives.