Tower-To-Rack Conversion Kit - HPE ProLiant ML110 Gen10 User Manual

Hide thumbs Also See for ProLiant ML110 Gen10:
Table of Contents

Advertisement

4. Install the SFF drive.
5. If a hot-plug drive is installed into an empty backplane after the initial boot, reboot the system to get optimal
ventilation.
6. Determine the status of the drive from the drive LED definitions.
7. Close the front bezel.
The installation is complete.
To configure arrays, see the HPE Smart Array SR Gen10 Configuration Guide at the Hewlett Packard Enterprise
website.

Tower-to-rack conversion kit

Use the tower-to-rack conversion kit to switch the tower server to rack mode operation. After the kit is installed, complete
in-rack serviceability for all server components is supported.
Kit contents
Left and right rack rail assemblies
Server tray
The following items included in the 874578-B21 option kit are not for use in this server:
Cable management arm
Chassis rear bracket screws (3)
Shipping brackets (2)
Shipping bracket screws (4)
Hardware options installation
50

Advertisement

Table of Contents
loading

Table of Contents