Server in rack mode: Remove the server from the rack.
Server in tower mode: Position the tower server for hardware configuration.
5.
Remove the access panel.
6.
Remove the PCI air baffle.
7.
Remove the system air baffle.
8.
Disconnect all the power supply cables connected to the system board.
9.
Remove the existing power supply.
10. Install the ATX 550W non-hot-plug power supply.
11. Connect the power supply cables.
12. Install the system air baffle.
13. Install the PCI air baffle.