Installing An Sff Hot-Plug Drive - HPE ProLiant ML110 Gen10 User Manual

Hide thumbs Also See for ProLiant ML110 Gen10:
Table of Contents

Advertisement

5. If the drive is installed in an empty drive cage after the initial system boot, reboot the system to maintain optimal
ventilation.
6. Determine the status of the drive from the drive LED definitions.
7. Close the front bezel.
The installation is complete.
To configure arrays, see the HPE Smart Array SR Gen10 Configuration Guide at the Hewlett Packard Enterprise
website.

Installing an SFF hot-plug drive

CAUTION: To prevent improper cooling and thermal damage, do not operate the rack unless all device bays are
populated with either a component or a blank.
Prerequisites
Before you perform this procedure:
Verify that the SFF hot-plug drive cage is installed.
Make sure that you have the SFF hot-plug drive option is available.
If you are installing an SFF hot-plug SAS drive or SSD, make sure that the redundant fan option kit is installed.
Procedure
1. Open the front bezel.
2. Remove the drive blank.
3. Prepare the drive.
Hardware options installation
49

Advertisement

Table of Contents
loading

Table of Contents