Process Connections - Emerson Rosemount 3051S Series Reference Manual

Pressure transmitter with foundation fieldbus protocol
Hide thumbs Also See for Rosemount 3051S Series:
Table of Contents

Advertisement

Installation
October 2016
Figure 2-5. In-Line Installation Examples
2.4.2

Process connections

Rosemount 3051S Transmitter flange process connection size is
NPT connections are available as the D2 option. Use your plant-approved lubricant or sealant when
making the process connections. The process connections on the transmitter flange are on 2
(54 mm) centers to allow direct mounting to a three- or five-valve manifold. Rotate one or both of the
flange adapters to attain connection centers of 2, 2
Install and tighten all four flange bolts before applying pressure to avoid leakage. When properly
installed, the flange bolts will protrude through the top of the SuperModule housing. Do not attempt to
loosen or remove the flange bolts while the transmitter is in service.
To install adapters to a coplanar flange, perform the following procedure:
1. Remove the flange bolts.
2. Leaving the flange in place, move the adapters into position with the O-ring installed.
3. Clamp the adapters and the coplanar flange to the transmitter module using the longer of the bolts
supplied.
4. Tighten the bolts. Refer to
12
Gas or liquid service
Table 2-1 on page 8
Gas service
/
–18 NPT. Flange adapters with
1
4
/
, or 2
/
inches (51 mm, 54 mm, 57 mm).
1
1
8
4
for torque specifications.
Reference Manual
00809-0200-4801, Rev DA
Liquid or steam service
/
-in.
1
8
Installation
/
–14
1
2

Advertisement

Table of Contents
loading

Table of Contents