Installing An Lff Non-Hot-Plug Drive - HPE ProLiant DL20 Gen10 User Manual

Hide thumbs Also See for ProLiant DL20 Gen10:
Table of Contents

Advertisement

Installing an LFF non-hot-plug drive

Installing an LFF non-hot-plug drive
Prerequisites
Prerequisites
Before you perform this procedure, make sure that you have the following tools available:
T-15 Torx screwdriver
Phillips No. 1 screwdriver
Procedure
Procedure
1. If installed, remove the front bezel .
2. Power down the server.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Remove the server from the rack .
6. Remove the access panel .
7. Disconnect all cables from the drive cage.
8. Remove screws from the drive cage. Each drive requires four screws.
9. Remove the non-hot-plug drive cage.
Installing an LFF non-hot-plug drive
73

Advertisement

Table of Contents
loading

Table of Contents