4. Remove two front bolts (A), and three rear bolts (B), and
remove coupler guard (C).
5. Remove leg pin bolts (A) from both sides, and retain
caps (B) (two per side) for reuse.
NOTE:
If you will be moving the windrower shipping assembly with
a crane, retain the leg pin bolts and nuts for reinstallation.
6. Remove two bolts (A) securing front the skids to lifting
plates (B) on each side.
215620
UNLOADING WINDROWER
Figure 2.12: Coupler Guard
Figure 2.13: Leg Pin Bolts and Caps
Figure 2.14: Front Skid Bolts
30
Revision A