MacDon M1 Series Unloading And Assembly Instructions page 37

Windrowers
Table of Contents

Advertisement

To move the windrower to the assembly area, follow these steps:
1. Attach the chains or cables to the four lifting points on the
lift sling, and connect the loop ends to the crane hook.
IMPORTANT:
Use cables or chains with a minimum lifting capacity of
3221 kg (7100 lb.).
2. Attach the lift sling to the four designated lifting points on
the windrower shipping frame as shown.
DANGER
To avoid injury or death from a swinging or falling load, keep all
bystanders clear when lifting. Equipment used for lifting must
exceed the maximum requirements specified in this section.
3. Lift the windrower off the platform and move it to the
setup area.
215620
UNLOADING WINDROWER
Figure 2.3: Lift Sling
A - 1500 mm (59 in.) Minimum
Figure 2.4: Shipping Frame Lifting Points
25
B - 2120 mm (83.5 in.) Typical
Revision A

Advertisement

Table of Contents
loading

This manual is also suitable for:

M1170M1240

Table of Contents