MacDon M1 Series Unloading And Assembly Instructions page 203

Windrowers
Table of Contents

Advertisement

5. Approach platform (A) on the left cab-forward side of the
windrower and ensure the cab door is closed.
6. Push latch (B), and pull platform (A) toward the walking
beam until it stops and the latch engages.
7. Disconnect electrical harness (D), and hydraulic hoses (A),
(B), and (C) from the windrower.
215620
ATTACHING A HEADER TO THE WINDROWER
191
Figure 5.157: Left Cab-Forward Platform
Figure 5.158: Header Drive Hydraulics – M1240
Connection Locations, Low Pressure Case Drain Kit
MD #6698 Installed
Figure 5.159: Header Drive Hydraulics – M1170
Connection Locations
Revision A

Advertisement

Table of Contents
loading

This manual is also suitable for:

M1170M1240

Table of Contents