Shipment Inspection
To inspect the shipment, perform the following steps:
1. Verify that you have received all items of your shipment.
MVME2500 board
Quick Start Guide
Safety Notes Summary
Any optional items ordered
2. Check for damage and report any damage or differences to customer service.
3. Remove the desiccant bag shipped together with the board and dispose of it according
to your country's legislation.
The product is thoroughly inspected before shipment. If any damage occurred during
transportation or any items are missing, contact customer service immediately.
2.3

Requirements

Make sure that the board meets the following requirements when operated in your
particular system configuration.
2.3.1

Environmental Requirements

Operating temperatures refer to the temperature of the air circulating around the
board and not to the component temperature.
32
Hardware Preparation and Installation
MVME2500 Installation and Use (6806800L01S)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MVME2500 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents