Unpacking And Inspecting The Board; Requirements - SMART Embedded Computing MVME7100ET Installation And Use Manual

Hide thumbs Also See for MVME7100ET:
Table of Contents

Advertisement

Hardware Preparation and Installation
2.2

Unpacking and Inspecting the Board

Read all notices and cautions prior to unpacking the product.
Damage of Circuits
Electrostatic discharge and incorrect installation and removal can damage circuits
or shorten their life.
Before touching the board or electronic components, make sure that you are
working in an ESD-safe environment.
Shipment Inspection
To inspect the shipment, perform the following steps:
1. Verify that you have received all items of your shipment.
2. Check for damage and report any damage or differences to customer service.
3. Remove the desiccant bag shipped together with the board and dispose of it according
to your country's legislation.
The product is thoroughly inspected before shipment. If any damage occurred
during transportation or any items are missing, contact customer service
immediately.
2.3

Requirements

Make sure that the board, when operated in your particular system configuration, meets the
requirements specified in the next sections.
30
NOTICE
MVME7100ET Single Board Computer Installation and Use (6806800K87G)
Hardware Preparation and Installation

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MVME7100ET and is the answer not in the manual?

Table of Contents