Logging In To The System - ADTRAN IQ 710 System Manual

Hide thumbs Also See for IQ 710:
Table of Contents

Advertisement

Introduction
Once connected to the IQ 710 via either a VT-100 terminal or PC configured as a VT-100 terminal, it is
necessary to login to the system to gain access to the management and provisioning functions. This DLP
provides specific steps for logging into the system and accessing the various management and provisioning
functions.
Prerequisite Procedures
Complete DLP-001, Connecting the Terminal or PC to the Craft/Control Port before logging in to IQ 710.
Tools and Materials Required
Male-to-female DB-9 cable (customer-provided) to connect to a VT-100 terminal or a PC configured
as a VT-100 terminal
VT-100 terminal or PC configured as a VT-100 terminal
DB-9 to DB-25 adapter if the PC's com port is DB-25 (customer-provided)
© 2002 ADTRAN, Inc.

LOGGING IN TO THE SYSTEM

61202800L1-1B
Section 5, Detail Level Procedures
IQ 710 System Manual
IQ 710
Page 85

Advertisement

Table of Contents
loading

Table of Contents