DLP-2 Logging in to the System
Introduction
Once connected to the Total Access 850, you must login to the system to gain access to the management
and provisioning functions. This DLP assumes you are connected to the Total Access 850 and provides
specific steps for logging into the system.
Prerequisite Procedures
Complete DLP-1, Connecting a VT100 Terminal or PC to the CRAFT Port.
To prevent electrical shock, do not install equipment in a wet location or during a
lightning storm.
Electronic modules can be damaged by static electrical discharge. Before handling
modules, put on an antistatic discharge wrist strap to prevent damage to electronic
components. Place modules in antistatic packing material when transporting or storing.
When working on modules, always place them on an approved antistatic mat that is
electrically grounded.
After the IP parameters have been provisioned (see DLP-3, Setting IP Parameters for the
Total Access 850), you can also log in via Telnet.
64203376L1-1B
© 2004 ADTRAN, Inc.
217