ADTRAN IQ 710 System Manual page 116

Hide thumbs Also See for IQ 710:
Table of Contents

Advertisement

61202800L1-1B
IQ 710
Section 5, Detail Level Procedures
Page 116
Prerequisite Procedures
This procedure assumes that the IQ 710 is powered up and connected to an active frame relay network.
Tools and Materials Required
Male-to-female DB-9 cable (customer-provided) to connect to either a VT-100 terminal or a PC con-
figured as a VT-100 terminal.
VT-100 terminal or PC configured as a VT-100 terminal
A DB9 to DB25 adapter will be required if the PC's com port is DB25.
To prevent electric shock, do not install equipment in a wet location or during a
lightning storm.
Electronic modules can be damaged by static electrical discharge. Before handling
modules, wear an antistatic discharge wrist strap to prevent damage to electronic
components. Place modules in antistatic packing material when transporting or storing.
When working on modules, always place them on an approved antistatic mat that is
electrically grounded.
IQ 710 System Manual
© 2002 ADTRAN, Inc.

Advertisement

Table of Contents
loading

Table of Contents