Commissioning

7
Commissioning
User qualification: trained user, see
n
Ä Chapter 4.4 'Users' qualifications'
on page 21
WARNING!
Sensor run in period
This can result in hazardous incorrect
metering
Consider the run in period of the
sensor during commissioning:
Correct measuring and metering
is only possible if the sensor is
working perfectly.
Adhere to the run in periods of
the sensor without fail.
Calculate the run in period when
planning commissioning.
It may take a whole working day
to run-in the sensor.
Observe the sensor operating
instructions.
After mechanical and electrical installa‐
tion, the controller must be integrated into
the measuring point.
48
Switch-on behaviour during
7.1
commissioning
Switching on first step
Installation and function control
Check that all connections are
made correctly
Make sure that the supply voltage
matches the voltage indicated on
the nameplate
1.
Switch the supply voltage on
2.
The controller displays a menu in
which you can set the language
with which you would like to operate
the controller
3.
Wait for the controller's module
scan
Module scan
Base module
Expansion module
LAN module
Profibus module
continue with <OK>
Fig. 25: Module scan
ð The controller indicates the
installed and identified con‐
troller modules.
4.
Press
A1081