Commissioning
6
Commissioning
Users' qualification: trained user, see
n
Ä Chapter 2.2 'Users' qualifications'
on page 10
WARNING!
Sensor run-in periods
This can result in hazardous incor‐
rect metering
–
Correct measuring and
metering is only possible if the
sensor is working perfectly
–
Please read the operating
manual for the sensor
–
The sensor must be calibrated
after commissioning
Following completion of mechanical and
electrical assembly, the DULCOMETER
Compact Controller should be integrated
into the measuring point.
6.1
Initial commissioning
When first switching on the
DULCOMETER
®
Compact Controller the
DULCOMETER
®
Compact Controller is in
a STOP state.
Selection of the measurement variable,
controller setting and setting of the var‐
ious, process-dependent, parameters
Ä Chapter 8 'Operating
takes place next.
menus for the measured variables pH and
ORP' on page 49 .
42
6.2
Selection of the measured
variable
The pH and redox measurement variables
are set in the
NOTICE!
Reset to factory settings
If you set or switch the measure‐
ment variable, all parameters in the
controller are reset to the factory
settings for the selected measure‐
ment variable.
You must then reset all the con‐
troller functions.
6.3
Setting the controller during
commissioning
®
NOTICE!
Reset to factory settings
When switching over the metering
direction, all actuators in the
DULCOMETER
troller are reset to the factory set‐
tings for the selected metering
direction.
For safety reasons, all actuators
are deactivated. The base load is
reset to 0 %. All parameters
relating to the actuator, are reset to
the factory setting.
Consequently all parameters
relating to the actuator, must be
reset.
'INPUT' menu.
®
Compact Con‐