Cng Dispenser Commissioning - tatsuno OCEAN TOWER Series Installation And User Manual

Table of Contents

Advertisement

Fuel Dispensers TATSUNO EUROPE ‐ Installation and User Manual  ,  revision 10, January 2022 
Now the dispenser is ready for fuel delivery. 
 
NOTE 
The above‐mentioned start of the electronic counter is described for the PDEX5 counter. The course is very 
similar for PDEX, TBELX and TBELTM counters. The version and checksum of the metrologically relevant part of the 
program and the status of switch SW1, which is covered by a cover and provided with a seal against misuse, are 
always displayed. 
5.2.1. CNG DISPENSER COMMISSIONING 
Setting of mass flow meter zero‐point 
All CNG mass flow meters based on the principle of the Coriolis effect are sensitive to the setting of zero 
(zero flow rate) because with a decreasing flow rate the measuring error increases. The setting of zero 
must be carried out after every dispenser installation and every meter exchange. The dispenser counter 
allows  carrying  out  the  procedure  of  setting  the  zero‐point  using  the  service  remote  controller.  The 
following procedure is intended for authorized service engineers or metrology officials only: 
Close input ball valves at the dispenser inlet and hang the filling nozzles onto the dispenser (filling 
nozzles must be in the nozzle boot during the zero‐point setting process) 
The calibration switch SW1‐1 must be in the OFF position. 
Set the parameter P97 to value 1 to activate the procedure for setting the zero‐point. The counter 
sends a command for setting the zero‐point to the mass meter. Subsequently, the counter waits for 
a response from the mass meter. It then ones send information that the zero‐point was set with the 
message "done" or was not set with the message "fail". 
Don't exit setup until the zero‐point setting procedure reports "done"!   
 
NOTICE‐CNG
If the zero‐point value is not correct, or the process of zero‐point not passed correctly then new 
 
filling is not allowed and error message E74 is appeared).
 
NOTICE‐CNG
The amount display (€) shows the current value of the zero‐point. The quantity display (kg) shows 
 
the course of the zero‐point setting procedure.
 
NOTICE‐CNG
In the CNGmass (Endress&Hauser) meter, the course of the procedure is signaled by an increasing 
 
number 1 ‐ 99. After reaching the value 99, the process is terminated, and the message "done" is shown.
 
Exit  service  mode  by  pressing  <R>  on  yellow  service  remote  transmitter  change  position  of 
switch SW 1‐1 to ON (PROTECTED) 
 
Open ball valves valves at the dispenser inlet. 
 
 
 
 