Dispenser Commissioning - tatsuno OCEAN TOWER Series Installation And User Manual

Table of Contents

Advertisement

5.2. DISPENSER COMMISSIONING 
ON/OFF switching of fuel dispensers is carried out in the main switchboard of the fuel station where the power 
supply of the dispensers is provided. Each dispenser has two power points in the main switchboard: 
The power supply of pump electric motors and suction vacuum pumps if included in the dispenser 
Power supply of the dispenser electronic counter, switching and heating circuits  
Both power points are secured by the circuit breakers that enable the dispenser to be switched on/off. 
RECOMMENDATION 
Turn on the backup UPS located in the kiosk (the green LED on the UPS turns on) 
Switching on the 230 V circuit breaker for stabilized power supply of the dispenser counter (all segments of 
the display are automatically tested and the last delivered values are displayed) 
Switching on the 3x400 V the power supply circuit breaker for electric motors of pumps and vacuum pumps 
(if installed). 
The following processes occur when the power of the PDEX5 counter is turned on: 
 test of display units (displays). The backlight of the displays lights up and then 
all display segments are displayed (eights)) for approx. 1 second  
time  delay  when  the  counter  is  switched  on.  Time  required  to  start  the 
multimedia display. During the time delay, the displays show the filling point to 
which the display is connected A, B, C or D and the time in seconds remaining 
until the electronic dispenser counter is activated. The length of the time delay 
(15) can be set by the counter parameter, by default it is without delay. The 
positions of switches SW1‐1, SW1‐2, SW1‐3 and SW1‐4 are displayed on the unit 
price  line  (1=ON;  0=OFF).  If  switch  SW1‐1  is  in  position  1,  then  the  selected 
metrological parameters cannot be set on the counter. 
processor unit test. Ten‐second test in which all functions and memory of the 
processor unit are checked. During the test, the side of the counter to which the 
display is connected (A, B, C or D) is displayed, and: 
‐ version of the metrologically relevant part of the program (VER 1.02), 
‐ checksum of the metrologically relevant part of the program (dbd2 2FA4). 
‐ processor board type PDE5S or PDE5L 
setting the counter status before switching it off. The information that would 
appear on the display before the counter was last turned off is displayed. If the 
counter  was  operating  in  manual  mode,  then  it  is  possible  to  start  pumping 
immediately after picking up the gun. If the counter was operating in automatic 
mode, it waits for communication with the control computer to be established 
and, if necessary, for the transaction to be terminated (payment), if it was not terminated regularly 
before switching off. 
We recommend that you turn on the dispenser as follows:
 
TATSUNO EUROPE a.s., www.tatsuno‐europe.com 
134
 
8888888
1888888 
88888 
 
A15
 
1000 
VER 
102 
1000 
dbd2 
FFA4 
1000 
A4             
0
PDE5S 
1000 
300.0 
10.00 
30.00 

Advertisement

Table of Contents
loading

This manual is also suitable for:

Shark economy seriesShark junior series

Table of Contents