Fuji Electric FE ZSS Instruction Manual page 45

Cross stack laser gas analyzer
Table of Contents

Advertisement

Receiver box
(3) Mount the removed receiver box and transmitter box using the hexagonal bolt.
(4) Provide the receiver/transmitter cable (for calibration) or the cable between control unit and receiver
unit (for calibration).
(5) Wiring should be performed as following figure.
INZ-TN1ZSS-E
exagonal bolt
Calibration gas cell
Cable between control unit and
receiver unit (for calibration)
tack
exagonal bolt
Receiver/Transmitter cable
(for calibration)
- 35 -
Transmitter box

Advertisement

Table of Contents
loading

Table of Contents