Concluding Steps; Removing Expansion Cards; Preliminary Steps - Fujitsu PRIMERGY TX150 S8 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY TX150 S8:
Table of Contents

Advertisement

Ê If applicable, install SFP+ transceiver modules to the expansion card as
described in sections
Ê If applicable, connect a BBU or FBU to the expansion card as described in
sections
"Installing a BBU" on page 224
9.4.1.4

Concluding steps

"Reassembling" on page 64
Ê
Ê Reconnect all external cables to the replaced expansion card.
"Connecting the server to the mains" on page 74
Ê
"Switching on the server" on page 75
Ê
"Updating RAID controller firmware" on page 90
Ê
Ê If applicable,
"Enabling Option ROM scan" on page 91
"Enabling SVOM boot watchdog functionality" on page 94
Ê
"Enabling BitLocker functionality" on page 100
Ê
Ê If
applicable,"After replacing / upgrading LAN controllers" on page 104
9.4.2

Removing expansion cards

Upgrade and Repair Unit
(URU)
Tools: tool-less
9.4.2.1

Preliminary steps

"Disabling or suspending BitLocker functionality" on page 79
Ê
"Shutting down the server" on page 50
Ê
Ê Remove all external cables from the expansion card to be removed.
"Disconnecting the server from the mains" on page 50
Ê
"Getting access to the component" on page 51
Ê
TX150 S8 / TX200 S7
"Installing SFP+ transceiver modules" on page
Upgrade and Maintenance Manual
Expansion cards and backup units
or
"Installing an FBU" on page
.
Hardware: 5 minutes
205.
229.
215

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy tx200 s7

Table of Contents