Installing The New System Board - Fujitsu PRIMERGY TX150 S8 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY TX150 S8:
Table of Contents

Advertisement

14.6.3 Installing the new system board

G
Figure 290: Installing the system board (A)
Ê Hold the system board by the memory module ejectors and a PCI slot.
V
CAUTION!
– Do not lift or handle the system board by any of its heat sinks!
– Ensure not to damage the EMI springs to comply with applicable
EMC regulations and satisfy cooling requirements and fire
protection measures.
Ê At a slight angle, lower the system board into the chassis. Make sure that
the system board is shifted under the cable guide (G) before you lower it
down.
TX150 S8 / TX200 S7
Upgrade and Maintenance Manual
System board and components
381

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primergy tx200 s7

Table of Contents