2 Choosing an Installation Site
2.1
Room Requirements
1. The location of this equipment should allow for high visibility of the
2. This equipment should not be installed on thick carpets for stability
3. Anti-static floor materials should be used around the equipment.
4. The PC monitor, emergency cut off switch and X-Ray exposure switch
With Cephalometric unit (optional): 2,500mm x 2,500mm/98.4" x 98.4" or wider
20
patient by the operator and the operator should be as near to the
patient as possible.
reasons.
should be installed in the vicinity of the operator so that he or she can
manage them simultaneously in case of emergency.
2500/98.4"
1321(52)
1914(75.4)
470(18.5)
1165(45.9)
Pax-i3D Smart(PHT-30LFO) Installation Manual
Need help?
Do you have a question about the PaX-i3D Smart and is the answer not in the manual?