3. System delivery to site:
Did you review and identify the delivery route and method for
equipment in advance?
Is the freight elevator available?
Is the security guard, if any, notified of the installation in advance?
Are two installers, including the helpers, available to move and
unload the equipment?
4. Before installation:
Site check list
Is the room large enough?. At minimum, with CEPH unit
2,200 mm x 2200 mm x 2,600 mm/
87" x 87" x 103. Without CEPH unit, 2,200 mm x 1,400 mm x 2,600
mm/ 87" x 55" x 103"
Is the door entrance wider than 800mm (32")?
Is a radiation protection plan in place?
Does equipment and PC use same dedicated circuit?
Does the electrical input conditions to installation site
meet the MEIGaN requirements?
Is the local Network IP address of clinic 192.168.33.xx?
Is compressor or air conditioner suction located right next to X-ray
Room?
Is the floor flat and level?
Is the carpet on the floor? If so, remove it
Pax-i3D Smart(PHT-30LFO) Installation Manual
Appendix
Yes
No
Yes
No
155