Choosing An Installation Site; Room Requirements - Vatech PHT-30CSS Installation Manual

Hide thumbs Also See for PHT-30CSS:
Table of Contents

Advertisement

2.

Choosing an Installation Site

2.1

Room Requirements

<Without CEPH Unit (optional): 2,500 mm (L) x 1,700 mm (W) or wider >
vatech A9 (Model: PHT-30CSS)
The equipment's location must allow the operator to
observe the patient clearly during the imaging.
The operator must stay close to the patient during the
imaging.
DO NOT install the equipment on a thick carpet.
Install the equipment on the anti-static floor.
Install the PC monitor, Emergency Stop Switch, and X-
ray Exposure Switch close to the operator so that
he/she can use them simultaneously in an emergency.
1,700 / 67"
Installation Manual
2. Choosing an Installation Site
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

A9

Table of Contents