KidKraft KINGSBRIDGE Installation And Operating Instructions Manual page 39

Table of Contents

Advertisement

Step 8: Attach Tunnel Floor Assembly to Fort
A: Place Tunnel Floor Assembly between Unit A and Unit B tight to each (9084) Lower Tunnel Insert then attach
with 4 (S4) #8 x 3" Wood Screws from the inside and 4 (S0) #8 x 7/8" Truss Screws from the outside per end .
(fig. 8.1, 8.2 and 8.3)
B: Pre-drill with a 3/16" drill bit then attach each Swing Bracket to the fort with 1 (WL3) 1/4 x 1-3/8" Wafer Lag
(with flat washer) per bracket. (fig. 8.2 and 8.4)
Fig. 8.1
Tunnel Floor
Top View
Assembly
Unit A
Swing
Bracket
Fig. 8.4
FW1
x 4
Fig. 8.3
S0
Unit B
WL3
x 4
Tight
S4
4 x
8 x
8 x
Unit A
Tight
9084
Hardware
1/4 x 1-3/8" Wafer Lag (1/4" flat washer)
WL3
#8 x 7/8" Truss Screw
S0
#8 x 3" Wood Screw
S4
39
Tunnel Floor
Assembly
S0
Fig. 8.2
Unit B

Advertisement

Table of Contents
loading

This manual is also suitable for:

F25010

Table of Contents