Installing At-Qsfpcu Cables; Figure 55: Removing The Dust Cover From Slot 17 - Allied Telesis AT-x550-18XTQ Installation Manual

X550 series, stackable 10gigabit intelligent access ethernet switches alliedware plus
Hide thumbs Also See for AT-x550-18XTQ:
Table of Contents

Advertisement

Installing AT-QSFPCU Cables

This section contains instructions on how to build the stack trunk with AT-
QSFPCU Cables. You can use the cables to build a stack trunk between
two switches that are physically near each other, in the same or adjoining
equipment racks. The model names of the cables are listed here:
AT-QSFP1CU - 1 meter
AT-QSFP3CU - 3 meters
Note
The cables of the stack trunk must crossover to different QSFP+
slots. The transceiver in slot 17 in one switch must connect to slot 21
in the other switch. For more information, refer to Figure 11 on page
40.
Please review "Guidelines to Handling SFP, SFP+, and QSFP+
Transceivers" on page 119 before performing this procedure.
To build the stack trunk with AT-QSFPCU Cables, perform the following
procedure:
1. Remove the dust cover from the QSFP+ slot 17 in one of the x550
Switches. Refer to Figure 55.
Figure 55. Removing the Dust Cover from Slot 17
2. Orient the connector on the AT-QSFPCU Cable with the release tab on
top and slide it into the slot until it clicks into place. Refer to Figure 56
on page 102.
x550 Series Installation Guide for Virtual Chassis Stacking
101

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x550-18xsq

Table of Contents