Monitoring The Initialization Processes - Allied Telesis 8100L Series Installation Manual

Fast ethernet switches
Table of Contents

Advertisement

Monitoring the
Initialization
Processes
Consider the following items as you power on the switch:
Connecting the two power cords to power sources that are on
different circuits will provide power redundancy to the switch in the
event a circuit fails.
The AT-8100S/24POE and AT-8100S/48POE Switches support
370 watts of PoE only when both internal power supplies are
connected to power sources. The switches have a PoE budget of
185 watts if just one power supply is functional. For background
information, refer to "Power Supplies" on page 54.
Refer to "Power Specifications" on page 109 for the power
specifications of the switches.
Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.  E3
Note
Pluggable Equipment. The socket outlet shall be installed near the
equipment and shall be easily accessible.  E5
It takes a minimum of forty seconds for a stand-alone switch to initialize its
management software programs and features, and load the configuration
file. You may monitor the progress of the initialization process by watching
the LEDs on the front panel. Table 16 on page 88 provides the various
LED states and the approximate time intervals of the initialization phases.
The time length of phase 4, loading the configuration file, varies from a few
seconds to a minute, depending on the number and complexity of the
commands in the file. The stack ID LED acts differently depending on
whether the unit is powered on or reset with the RELOAD or RESET
command.
Stand-alone Switch Installation Guide for 8100L and 8100S Series Switches
87

Advertisement

Table of Contents
loading

Table of Contents